CAIRNGORM WILDERNESS CONTRACTS LTD
  • Home.
  • About.
  • Previous projects
    • 2012 >
      • Strath Nethy Bridge.
      • Culvert removal.
      • Dulnain Bridge riverside path repairs.
      • Carn Ban Mor.
      • North Corries Rim.
      • Nethy Bridge, walkway and bridge.
      • Meall Dubh, Kinloch Rannoch.
    • 2013 >
      • Creag Bheag; >
        • Creag Bheag North side mountain path.
        • Creag Bheag golf course circular.
      • Sron na Lairige; >
        • Remote Accomodation System, (RAS).
        • Full build path.
        • Light touch work.
      • Lairig an Laoigh; >
        • Light touch, experimental work.
        • Full build contract. Pt1 2013
      • RSPB bog reclamation work.
    • 2014 >
      • ACE Bridge.
      • Coire na Ciste, Cairngorms
      • Northern Corries Rim, Cairn Lochan 2014
      • March burn, Cairngorms
      • Corrie Domhain, Cairngorms
      • Lairig an Laoigh pt2, 2014
      • Chalamain Gap/Lairig Ghru Junction
    • 2015 >
      • FCS Glen Affric
      • Chalamain gap.
      • Dubh Loch
      • Ben A'an
      • Ben Nevis
    • 2016 >
      • FCS Loch Ness
      • Mayar
      • Ben Ledi
  • 2017
    • The Snub, Glen Clova
    • Beinn A'Ghlo (return path)
    • Croagh Patrick Survey (Ireland)
    • Ben Nevis
    • Cairn Liath, CNP 1 >
      • year 1.
  • 2018
    • Ben Vorlich, Loch Sloy
    • Ben Narnain
    • Cairn Liath 2
    • Ben Lui. Loch Lomond Trossachs NP
    • Ben More 1
  • 2019
    • Ben More 2
    • Bruntscar YDNP
    • Cairn Liath 3
  • 2020
    • Ben Venue. Loch Lomond Trossachs NP
    • Ben More 3
    • Cairn Liath, Fen path
    • Coire na Ciste
  • News and updates.
  • C.O.A.T Training.
  • Testimonials.
  • Gallery.
  • Contact us.

Creag Bheag.

Unlike on the other side of Creag Bheag where, as trainees we built a path, the North side overlooking Loch Gynack is bereft of usable stone, so for this project it was necessary to fly all the stone and aggregate in.
The contract was to build 580m of stone pitching with aggregate surfaces, the construction of stone built drainage features with lateral drainage and the reinstatement of the site and landscaping to optimise the natural regeneration.

Construction phase photos.

The completed path, a walk to the top