Bynack More culvert removal.
At the beginning of 2011, COAT contracted us to replace the plastic culverts, on the path leading from the bridge at Strath Nethy up to Bynack More, with stone cross drains.
|
The completed path.
After the removal of all of the old plastic culverts and the replacement of them with new stone built cross drains, the existing path was reinstated. There were some additional areas where the path surface had become poor so those areas were repaired as well, and if required, the height of the path was raised to protect it.
|